🏭 Suministro de Fábrica · Base de Montaje Superficial
Base de Montaje Superficial para Poste Cuadrado
- Compatibilidad: Apta para postes cuadrados de 1.75", 2.00" y 2.25".
- Galvanizado en Caliente: Protección duradera contra la oxidación en exteriores según ASTM A123.
- Fijación al Suelo: Placa con 4 orificios para anclajes de expansión en hormigón o asfalto.
- Seguridad Desacoplable: Cumple con normativas de seguridad vial ante impactos.
- Montaje Rápido: Instalación en menos de 5 minutos sin romper pavimento.
Square post surface mount base is a great choice when you need to install a signpost on concrete or asphalt surfaces and don't want to cut through them to install the post. Two versions are available for 1¾″ or 2″ posts and it is made of galvanized steel for durability. It has four 9/16″ mounting holes in each corner of the base plate for anchoring the base to the ground.
This Square Post Surface Mount Base is designed to hold galvanized square posts up to 8 ft. tall on surfaces like concrete and asphalt.

Metal Base Plate for Square perforated posts

Flat Mounted Concrete Base for Square Sign Posts
Installation instructions
There are two options for installing your surface mount base in the ground, based on the type of surface you are installing the base in. Option 1 utilizes concrete anchors for concrete surfaces and option 2 utilizes an asphalt anchor kit for asphalt surfaces.
1、Concrete Anchors
- Place base on the surface, align to the desired position.
- Using the base as a template, mark the four (4) holes to establish a pattern for drill.
- Drill four (4) holes 3″ (75mm) deep using a ⅝″ (16mm) drill bit. Clean holes.
- Using a small hammer gently tap the anchors into the holes.
- Place base over the anchors. Put washer onto the lag screw. Start lag screw through base hole into the anchor. Use ¾″ wrench to tighten lag screw snug into base.
- Insert your signpost to the base and secure the post by tightening the two bolts on the side of the base using the ½″ socket.
2、Asphalt Anchors
- Drill holes (4) per anchor specs on the side.
- Fill holes with grout (1 bag of grout per every 2 holes).
- Push anchors in flush with the surface and wait 15 minutes.
- Attach the base to anchors by using the 1″ long bolts and washers supplied.
- Insert your signpost to the base and secure the post by tightening the two bolts on the side of the base using the ½″ socket.

Comunicación con los clientes desde el corazón: ¡podemos hacerlo mejor! Correo electrónico: jinshi@wiremeshsupplier.com
Hebei jinshi industrial metal co., ltd